- ᐊᖁᑏᑦ
- 187Baseline <> Amberwood
- October 2026
187Baseline <> Amberwood · preliminary, to Oct 30
Route 187 · October 2026 · Preliminary, figures to Oct 30
82.3% on time so far, 65 of 139 all-day routes.82.3% on time so far.
65 of 139 all-day routesTarget 85%
Did not runᓱᓕ ᐅᒃᑐᖅᑕᐅᓯᒪᙱᑦᑐᖅ
up 3 points from September
8 of 20 measured days met the 85% target.
ᐊᑐᖅᑎᑦ ᐱᕕᖏᑦ ᐊᓯᐅᔪᑦ: ᓱᓕ ᐅᒃᑐᖅᑕᐅᓯᒪᙱᑦᑐᖅ
Target 85%Not run yet
Month by month
Months this site has measured, grade under each. October outlined.
- Aug 88.5%
- Sep 79.2%
- Oct 82.3%
Bottom of the table, October
The 139 ranked all-day routes, by share on time
What changed in October
Not measured yet.
Riders said
Not measured yet.
- September 2026 · 79.2% · CNovember starts Sunday
- More on OctoberBottom of the table, riders said, CSV
Take this month with you
- Download this monthCSV of the network report, October 2026CSV ᑎᑎᖅᑲᖅ
- Share this monthWith the month’s social card
- ᑕᖅᑭᖅ ᐊᓂᒍᖅᑐᖅSeptember 2026 · 79.2% · C September
- ᑕᖅᑭᖅ ᖃᐃᔪᖅNovember starts Sunday