- ᐊᖁᑏᑦ
- 117Baseline <> Greenboro
- October 2026
117Baseline <> Greenboro · preliminary, to Oct 30
Route 117 · October 2026 · Preliminary, figures to Oct 30
81.9% on time so far, 69 of 139 all-day routes.81.9% on time so far.
69 of 139 all-day routesTarget 85%
Did not runᓱᓕ ᐅᒃᑐᖅᑕᐅᓯᒪᙱᑦᑐᖅ
down 2 points from September
7 of 20 measured days met the 85% target.
ᐊᑐᖅᑎᑦ ᐱᕕᖏᑦ ᐊᓯᐅᔪᑦ: ᓱᓕ ᐅᒃᑐᖅᑕᐅᓯᒪᙱᑦᑐᖅ
Target 85%Not run yet
Month by month
Months this site has measured, grade under each. Never above the target. October outlined.
- Aug 76.8%
- Sep 83.6%
- Oct 81.9%
Bottom of the table, October
The 139 ranked all-day routes, by share on time
What changed in October
Not measured yet.
Riders said
Not measured yet.
- September 2026 · 83.6% · BNovember starts Sunday
- More on OctoberBottom of the table, riders said, CSV
Take this month with you
- Download this monthCSV of the network report, October 2026CSV ᑎᑎᖅᑲᖅ
- Share this monthWith the month’s social card
- ᑕᖅᑭᖅ ᐊᓂᒍᖅᑐᖅSeptember 2026 · 83.6% · B September
- ᑕᖅᑭᖅ ᖃᐃᔪᖅNovember starts Sunday