- ᐊᖁᑏᑦ
- 111Billings Bridge / Carleton <> Baseline
- October 2026
111Billings Bridge / Carleton <> Baseline · preliminary, to Oct 31
Route 111 · October 2026 · Preliminary, figures to Oct 31
75.6% on time so far, 96 of 139 all-day routes.75.6% on time so far.
96 of 139 all-day routesTarget 85%
Did not runᓱᓕ ᐅᒃᑐᖅᑕᐅᓯᒪᙱᑦᑐᖅ
up 4 points from September
3 of 31 measured days met the 85% target.
ᐊᑐᖅᑎᑦ ᐱᕕᖏᑦ ᐊᓯᐅᔪᑦ: ᓱᓕ ᐅᒃᑐᖅᑕᐅᓯᒪᙱᑦᑐᖅ
Target 85%
D for 2 months in a row (3 shown).Month by month
D for 2 months in a row (3 shown). Never above the target. October outlined.
- Aug 82.5%
- Sep 72%
- Oct 75.6%
Bottom of the table, October
The 139 ranked all-day routes, by share on time
What changed in October
Not measured yet.
Riders said
Not measured yet.
Take this month with you
- Download this monthCSV of the network report, October 2026CSV ᑎᑎᖅᑲᖅ
- Share this monthWith the month’s social card
- ᑕᖅᑭᖅ ᐊᓂᒍᖅᑐᖅSeptember 2026 · 72% · D September
- ᑕᖅᑭᖅ ᖃᐃᔪᖅNovember starts Sunday