रूट 582: Craig Henry ⇄ Tunney's Pasture
- CRAIG HENRY / IVYLEA
- CRAIG HENRY / AD. 311
- CRAIG HENRY / BERTONA
- CRAIG HENRY / JACK AARON
- CRAIG HENRY / ALDRIDGE
- CRAIG HENRY / ALDRIDGE
- CRAIG HENRY / CONOVER
- CRAIG HENRY / MARKHAM
- CRAIG HENRY / SHOREHAM
- CRAIG HENRY / ELVASTON
- GREENBANK / CANFIELD
- BELLMAN / GREENBANK
- MCCLELLAN / CAMWOOD
- MCCLELLAN / RIVERBROOK
- MCCLELLAN / HOBART
- MCCLELLAN / CRAMER
- MCCLELLAN / NANCY
- BANNER / NANCY
- BANNER / PARKMOUNT
- GREENBANK / BANNER
- GREENBANK / ASHGROVE
- GREENBANK / MEADOWBANK
- GREENBANK / MONTEREY
- GREENBANK / LISA
- TUNNEY'S PASTURE C
Where lateness is made ·
Not measured yet: too few weekdays with bus positions on this stretch.
The line right now · 5:23 pm
The line right now · 5:23 pm
Live, 51 s ago
समय परदेर सेनहीं आईLive, 51 s ago
- CRAIG HENRY / IVYLEA
- CRAIG HENRY / AD. 311
- CRAIG HENRY / BERTONA
- CRAIG HENRY / JACK AARON
- CRAIG HENRY / ALDRIDGE
- CRAIG HENRY / ALDRIDGE
- CRAIG HENRY / CONOVER
- CRAIG HENRY / MARKHAM
- CRAIG HENRY / SHOREHAM
- CRAIG HENRY / ELVASTON
- GREENBANK / CANFIELD
- BELLMAN / GREENBANK
- MCCLELLAN / CAMWOOD
- MCCLELLAN / RIVERBROOK
- MCCLELLAN / HOBART
- MCCLELLAN / CRAMER
- MCCLELLAN / NANCY
- BANNER / NANCY
- BANNER / PARKMOUNT
- GREENBANK / BANNER
- GREENBANK / ASHGROVE
- GREENBANK / MEADOWBANK
- GREENBANK / MONTEREY
- GREENBANK / LISA
- TUNNEY'S PASTURE C
- TUNNEY'S PASTURE D
- GREENBANK / LISA
- GREENBANK / MONTEREY
- GREENBANK / MEADOWBANK
- GREENBANK / ASHGROVE
- BANNER / PARKMOUNT
- BANNER / PARKMOUNT
- BANNER / OAKMORE
- MCCLELLAN / PAULA
- MCCLELLAN / GRADY
- MCCLELLAN / HOBART
- MCCLELLAN / RIVERBROOK
- MCCLELLAN / CAMWOOD
- BELLMAN / MCCLELLAN
- GREENBANK / BELLMAN
- CRAIG HENRY / GREENBANK0 min
- CRAIG HENRY / SHOREHAM1 min
- CRAIG HENRY / MARKHAM2 min
- CRAIG HENRY / CONOVER3 min
- CRAIG HENRY / ALDRIDGE4 min
- CRAIG HENRY / JACK AARON4 min
- CRAIG HENRY / BERTONA5 min
- CRAIG HENRY / AD. 1785 min
- CRAIG HENRY / WOODVALE
Stops and scheduled times from OC Transpo’s timetable (GTFS, 2026-10-30). Live minutes from bus positions, 51 s ago.
Right now on Route 582
1 busesOpen on the map
0 सूचनाएँfrom OC Transpo
Planned change · 2026-10-30service change
Dated service
Trips scheduled that day
The timetable, notices and what the live feed says are shown apart. Seeing a bus on the map does not prove you can board it.
2 नवंबर 2026 · 4 trips in the retained timetable · retained notices; capture coverage unverified
In short: 4 with a matched position · 0 with no matching position (to investigate) · 0 with an unknown outcome.
- 06:44– 07:20Trip 12537020Vehicle position matchedFirst / last feed position: 6:16 am GMT-5 / 7:19 am GMT-5; not actual start or end times.
- 07:45– 08:32Trip 7334020Vehicle position matchedFirst / last feed position: 7:21 am GMT-5 / 8:33 am GMT-5; not actual start or end times.
- 15:38– 16:14Trip 9258020Vehicle position matchedFirst / last feed position: 2:56 pm GMT-5 / 4:15 pm GMT-5; not actual start or end times.
- 16:38– 17:14Trip 17500020Vehicle position matchedFirst / last feed position: 4:16 pm GMT-5 / 5:16 pm GMT-5; not actual start or end times.
More on Route 582
1 busesOpen on the map
Planned change · 2026-10-30service change
Would you count on route 582?
No sign-in needed. A vote from a device that is not signed in counts a little less than one from an account, and a person who rates many routes counts a little less on each, so no one voice outweighs the rest.
इस रूट पर रद्द ट्रिप
रद्द ट्रिप की गिनती कैसे होती है2 partial-capture days not counted.
पिछले चार हफ्तों में इस मार्ग पर रद्द की गई कोई यात्रा नहीं गिनी गई। जिन सूचनाओं की हम जाँच नहीं कर सके, वे नीचे सूचीबद्ध होंगी।
Did not come (no bus seen, no notice), last 7 days: none among the trips we could check.
इस रूट के पास शहर का सड़क कार्य
All road work on AlertsRoad work and event closures the City of Ottawa has published, measured as near this route’s path. Near is not proof that the bus is detoured: check the operator’s alerts for that.
- Baselineसड़क का काम · About 0 m from the routeThe City flags a transit impact.Until 30 नव॰ 2026
- Greenbankसड़क का काम · About 0 m from the routeThe City flags a transit impact.Until 30 नव॰ 2026
- BANNERसड़क का काम · About 1 m from the routeThe City flags a transit impact.Until 13 नव॰ 2026
- CARLINGसड़क का काम · About 0 m from the routeUntil 13 नव॰ 2026
- Kichi Zibi Mikanसड़क का काम · About 0 m from the routeUntil 20 नव॰ 2026
Updated 3 नव॰ 2026
Source: City of Ottawa open data. City road work map
More on Route 582
- Other daysअक्टूबर 2026Days →
- Today’s timelineArchived bus positions in ReplayReplay →
- Road work on this routeStops moved and time added by road workWorks →
- Service change scorecardHow a service change didScorecard →
- Crowding and service deliverySTO crowding, rail, trips deliveredCrowding →
- आँकड़े कहाँ से आते हैंOC Transpo timetable and live bus positionsSources →
- Page not loading?The timetable still opensफिर कोशिश करें
- पूरा रिपोर्ट कार्ड
- अपने पार्षद को बताइए
- Fix this routePropose a change to this route in Design the networkFix this →
- Change this routeDraw a different route or timetable in Design the networkChange this route →