47GLENWOOD · preliminary, to Okt 30
Route 47 · Oktoobar 2026 · Preliminary, figures to Okt 30
65.2% on time so far, 121 of 139 all-day routes.65.2% on time so far.
121 of 139 all-day routesTarget 85%
Did not runWeli lama cabbirin
up 5 points from Sebteembar
5 of 18 measured days met the 85% target.
Waqtiga rakaabka lumay: Weli lama cabbirin
Target 85%Not run yet
F for 3 months in a row (3 shown).Month by month
F for 3 months in a row (3 shown). Never above the target. All bars in the 60 to 70 band; Oktoobar outlined.
- Ogs 64.4%
- Seb 60.6%
- Okt 65.2%
Bottom of the table, Oktoobar
The 139 ranked all-day routes, by share on time
What changed in Oktoobar
Weli lama cabbirin.
Riders said
Weli lama cabbirin.
- Sebtembar 2026 · 60.6% · FNoofeembar starts Axad
- More on OktoobarBottom of the table, riders said, CSV
Take this month with you
- Download this monthCSV of the network report, Oktoobar 2026CSV
- Share this monthWith the month’s social card
- Bishii horeSebtembar 2026 · 60.6% · F Sebteembar
- Bisha danbeNoofeembar starts Axad