- Ohahà:
- 58PRÉ TUNNEY
- October 2026
58PRÉ TUNNEY · preliminary, to Oct 30
Route 58 · October 2026 · Preliminary, figures to Oct 30
83.9% on time so far, 51 of 139 all-day routes.83.9% on time so far.
51 of 139 all-day routesTarget 85%
Did not runShé:kon iah tetewatahsónteren
unchanged from September
10 of 18 measured days met the 85% target.
Tsi niió:re wahón:nise: Shé:kon iah tetewatahsónteren
Target 85%Not run yet
B for 2 months in a row (3 shown).Month by month
B for 2 months in a row (3 shown). October outlined.
- Aug 94.3%
- Sep 84%
- Oct 83.9%
Bottom of the table, October
The 139 ranked all-day routes, by share on time
What changed in October
Not measured yet.
Riders said
Not measured yet.
Take this month with you
- Download this monthCSV of the network report, October 2026CSV
- Share this monthWith the month’s social card
- Ohén:tonSeptember 2026 · 84% · B September
- Ó:ia' wenhni:tareNovember starts Sunday