- Ohahà:
- 33FREEMAN/G-ROY/OTTAWA
- October 2026
33FREEMAN/G-ROY/OTTAWA · preliminary, to Oct 31
Route 33 · October 2026 · Preliminary, figures to Oct 31
79% on time so far, 80 of 139 all-day routes.79% on time so far.
80 of 139 all-day routesTarget 85%
Did not runShé:kon iah tetewatahsónteren
up 5 points from September
8 of 25 measured days met the 85% target.
Tsi niió:re wahón:nise: Shé:kon iah tetewatahsónteren
Target 85%
Month by month
Months this site has measured, grade under each. Never above the target. All bars in the 70 to 80 band; October outlined.
- Aug 77.1%
- Sep 74.5%
- Oct 79%
Bottom of the table, October
The 139 ranked all-day routes, by share on time
What changed in October
Not measured yet.
Riders said
Not measured yet.
- September 2026 · 74.5% · DNovember starts Sunday
- More on OctoberBottom of the table, riders said, CSV
Take this month with you
- Download this monthCSV of the network report, October 2026CSV
- Share this monthWith the month’s social card
- Ohén:tonSeptember 2026 · 74.5% · D September
- Ó:ia' wenhni:tareNovember starts Sunday