- Ohahà:
- 48Hurdman <> Carleton
- November 2026
OctoberDecember starts Tuesday
48Hurdman <> Carleton · preliminary, to Nov 2
Route 48 · November 2026 · Preliminary, figures to Nov 2
80.7% on time so far, 89 of 132 all-day routes.80.7% on time so far.
89 of 132 all-day routesTarget 85%
Did not runShé:kon iah tetewatahsónteren
up 2 points from October
None of the 2 measured days met the 85% target.
Tsi niió:re wahón:nise: Shé:kon iah tetewatahsónteren
Target 85%Not run yet
C for 3 months in a row (4 shown).Month by month
C for 3 months in a row (4 shown). Never above the target. November outlined.
- Aug 84%
- Sep 79.6%
- Oct 78.6%
- Nov 80.7%
Bottom of the table, November
The 132 ranked all-day routes, by share on time
What changed in November
Not measured yet.
Riders said
Not measured yet.
- October 2026 · 78.6% · CDecember starts Tuesday
- More on NovemberBottom of the table, riders said, CSV
Take this month with you
- Download this monthCSV of the network report, November 2026CSV
- Share this monthWith the month’s social card
- Ohén:tonOctober 2026 · 78.6% · C October
- Ó:ia' wenhni:tareDecember starts Tuesday