Route 26 · September 2026 · Published October 4, 2026
85.7% on time, 47 of 140 all-day routes.85.7% on time.
47 of 140 all-day routesTarget 85%
Did not runShé:kon iah tetewatahsónteren
down 7 points from August
11 of 21 measured days met the 85% target.
Tsi niió:re wahón:nise: Shé:kon iah tetewatahsónteren
Target 85%
A for 2 months in a row (2 shown).Month by month
A for 2 months in a row (2 shown). September outlined.
- Aug 92.9%
- Sep 85.7%
Bottom of the table, September
The 140 ranked all-day routes, by share on time
What changed in September
Not measured yet.
Riders said
Not measured yet.
- August 2026 · 92.9% · AOctober starts Thursday
- More on SeptemberBottom of the table, riders said, CSV
Take this month with you
- Download this monthCSV of the network report, September 2026CSV
- Share this monthWith the month’s social card
- Ohén:tonAugust 2026 · 92.9% · A August
- Ó:ia' wenhni:tareOctober starts Thursday